What a Great Renovation Quotation Looks Like in Edinburgh

A proper renovation quotation is a written document that names the drawings it was priced from, lists the work room by room and says what is left out. If two quotes for your Edinburgh home cannot be compared line by line, at least one of them is too vague to sign.

Brunon Rogowski
Brunon RogowskiFounderDecember 20255 min read

A proper quotation lets you see exactly what you are buying before you sign. It names the drawings, lists the work in each room, describes the materials, and sets out the exclusions and assumptions in plain words. A single figure with “renovate kitchen and bathroom” underneath is a statement of intent, not a quotation.

The detail matters more in older Edinburgh homes. Tenements and villas hide things until the work opens them up: lath and plaster that comes away when a wall is cut, floors that are not level, old pipe runs, and services shared with the rest of the stair. A good quotation says how each of these is treated. A vague one leaves them to be argued about once the job has started.

What a proper quotation itemises, and what a vague one leaves out

ItemA proper quotationA vague quotation
Drawings pricedNames the drawing or schedule revision usedSays “as per drawings” or nothing
Scope by roomLists the work in each room or areaOne line per room, or one total for the whole job
MaterialsNames the products, grades or codes included in the priceUses “allowance” or “to client choice” with no specification
Strip-out and making goodSays what is removed and where the making good stopsSilent, so the edge of the work is unclear
DecorationNames the rooms and surfaces includedMentions “decorate” without saying where
Protection, access and wasteCovers the common stair, deliveries and waste removalNot mentioned
ConsentsShows which items wait for a building warrant or other consentTreats all the work as ready to start
AssumptionsStates what was assumed where nothing could yet be seenAssumptions stay in the contractor’s head
Provisional sumsSays what each one covers and how it will be firmed upSeveral sums with no description
ExclusionsA named list of what is not includedNo list, or “anything not mentioned”
VATStates clearly whether VAT is includedLeaves you to guess
Payment and changesPoints to the contract terms for payments and variationsNo mention of how changes are agreed

A provisional sum is a figure for work that cannot yet be fully defined, such as repairs behind a wall that has not been opened. A few are normal in an old building. A quotation made mostly of provisional sums has not really priced the job.

Start with the drawing it was priced from

We start there. For Sweet Homes, “architect’s drawings” is too vague when several revisions have circulated and the engineer’s detail arrived later. Our quotation names the drawing or schedule revision used.

Sweet Homes prices the construction information issued to us. The homeowner appoints the architect, structural engineer and warrant professional, so their appointments and application work do not drift silently into our construction scope.

Sweet Homes supplies and fits the materials it installs, so the products and the work are priced together in one quotation. That keeps responsibility for both in one place.

For a room with equipment and fitted cabinetry, the media wall service and bespoke home office service show why the product and equipment brief needs to be defined before pricing.

In Scotland, a building warrant must be granted before work starts on structural alterations, on forming or closing an opening in a load-bearing wall, on a loft or garage conversion, or on a change of use. Planning permission and listed building consent are separate permissions. A listed building, or a flat in a conservation area such as the New Town, may need one of those as well.

A good quotation shows which items depend on a warrant or consent. It does not present that work as ready to start before the permission is in place. Our guide to when a building warrant is needed for interior alterations covers the common cases.

Trace one altered wall through the quotation

When we review a quotation, we take one wall from the drawing and find it in the scope. If it is being removed, we look for the support, the service diversions and the making good around the opening. “Alter wall as shown” may leave the connection between those entries unclear.

The structural detail might still be missing when quotations are requested. The contractor can then state an assumption, or leave the work unpriced while the connection detail stays with the engineer.

We read the exclusions against the same wall. Decoration outside the altered area or a specialist survey may sit elsewhere. The wording may place the contractor’s stopping point at the new plaster edge in the adjoining room.

Do the same exercise on competing quotations before comparing their totals. One may follow the engineer’s issued detail while another still relies on the architect’s earlier opening.

How to compare two quotations

Work through this list before you look at the totals:

  • Check both were priced from the same drawing revision.
  • Line up the rooms and the work listed in each.
  • Compare the materials: the same product, a similar one, or an allowance.
  • Read the exclusions side by side. Decoration, making good, waste and protection of the common stair are the usual gaps.
  • Count the provisional sums and ask what each one covers.
  • Check that VAT is shown the same way in both.
  • Ask how changes will be agreed and priced before the extra work is done.
  • Ask for any omission or unclear item to be resolved in writing.

A conversation about plastering does not, by itself, mean that every wall is included in the quotation. Read the named areas and the preparation and finish allowed for. The cheaper total is often the one with the longer list of things left out.

Payment and changes

The project contract records payment and change terms. Sweet Homes does not apply a percentage schedule or variation wording drawn from this article. Whatever the contractor, a change to the agreed work should be described, priced and approved in writing before it is carried out.

Talk it through

Request a call about a defined construction scope. Include the property type, Edinburgh area and the drawing stage reached. Send your enquiry by form or email. We will reply and arrange a follow-up call to talk through the project.

For the work a whole-property quotation can cover, see our managed home renovations in Edinburgh. If the property is a flat, our page on flat renovations in Edinburgh explains how the scope is put together, and our tenement renovation page covers the shared stair and building constraints that a tenement quotation needs to reflect. The construction scope is priced from the agreed design and specification.