You can draw up both layouts now and choose separate dates for the work. Much depends on the property, who lives there and when you want to spend the money. As Brunon at Sweet Homes puts it, “We don't push for anything, we do whatever the client prefers.”
Start with a working toilet
Ask which toilet will be working when you get up, when you get home and in the middle of the night. If you have a second bathroom, check whether shutting off the water to the first one will affect it. Can everyone reach it when there are tools in the hall or the floor is up?
For a family with young children, someone who is pregnant or anyone who needs an accessible toilet, going elsewhere each time may be impractical. Before your only toilet comes out, agree where you can use another one, including at night. If that means staying elsewhere for part of the job, ask the contractor to tell you as soon as those dates change.
Brunon recalls a retired couple who had just moved into a new-build home. They chose to have both rooms done together. They had yet to unpack fully and had enough space to keep their old fridge freezer running. They had a second bathroom, no children or pets at home, and went on holiday for several days while the work carried on.
If you plan to stay, work through an ordinary evening. Where can you prepare food, get drinking water, wash up and take a shower? Agree where you can safely plug in the appliances you’ll keep using and where the team will store tools and materials. A spare room is more use as a temporary kitchen if you can get to it throughout the job.
One programme or two?
If the kitchen and bathroom pipes run under the same stretch of floor, ask whether the team can reach them both while it is open. Doing both rooms together may avoid lifting and repairing that floor twice. It also means you could lose the sink and the shower at the same time.
Two phases can suit you if you want to spread the spending or keep one room in daily use. Ask what the first phase can leave ready for the second. If you have the kitchen done first, for example, will the plumber still be able to reach the bathroom pipes without disturbing a new cabinet?
Compare the two options for your own home. Find out what each would mean for time spent elsewhere, the rooms you can use and any work you would have to pay for twice. Our guide to planning a renovation in stages covers the same decision across a whole home.
Put both rooms on one drawing
Write down what needs to change in each room and what you want to keep. In the kitchen, that might be space to cook together and a better position for the sink. In the bathroom, it might be a shower that is easier to use and storage within reach.
Mark the intended positions of the sink, appliances, bath, shower and toilet on a simple plan. Include the boiler, any hot water cylinder and any cupboards where pipework is boxed in. Show the space between the rooms too. The team may need access from the other side of a wall. If you are still choosing where to put the sink and appliances, see our kitchen renovation planning guide.
Check what the two rooms share
Water and drainage
Moving a sink or shower means checking how water gets there and how it drains away. Where water drains by gravity, the waste pipe needs a route with enough slope for it to run away. In an older flat, the floor may be too shallow to take the pipe where you want it. Ask the plumber to check the route before you settle on the layout.
In a tenement, find out whether the proposed work affects a shared pipe or part of the building. Some details may only become clear once an agreed area is opened. Ask how the team will explain any extra work and get your agreement before it goes ahead.
Hot water and the boiler
Think about how the household uses hot water. Would someone shower while another person washes up? Does the existing system cope now? An installer can assess the boiler or hot water cylinder, the incoming water supply and the proposed fittings together.
A combination boiler heats water as it is needed. If the shower flow drops when someone turns on the hot tap in the kitchen, tell the installer. They can check how much hot water the boiler and the incoming supply can provide together. If you have a cylinder, it stores hot water for later use.
Electrics and lighting
Give the electrician a list of the intended appliances and their positions in both rooms. Include the hob, oven, extractor, bathroom fan, lighting and any electric shower. Ask whether the existing circuits and consumer unit, the box that holds the fuses or circuit breakers, suit the proposed work.
Bathroom electrical fittings need particular care around water. Plan the location and suitability of lights and controls with the electrician. In the kitchen, consider where sockets and switches can be reached without trailing leads across the worktop. Decide where mirrors, cabinets and appliances will sit before the cables are fixed.
Ventilation
Both rooms produce moisture. Plan how it will leave each room and how replacement air will enter. If a fan needs a duct to carry damp air outside, ask the team to mark its route on the drawing alongside the cupboards, ceilings and any boiler.
What to ask about the order of work
Ask the contractor to mark on the programme when the water or power will be off and when the toilet, shower and kitchen sink will be usable. The two rooms can progress at different speeds. The dates that matter if you are living there may fall well before the final handover.
- Which pipes and cables will the plumber and electrician need to reach before a floor is closed or a cabinet goes in?
- What preparation does the chosen shower waterproofing need, and how long must it be left before the next job can start?
- Who will tell you when the fittings have been tested and the room is ready to use?
Agree who will give you the relevant certificates and product information at handover. For the wider project, see our guide to the order of renovation work.
Choose finishes that work in both rooms
A similar timber tone, wall colour or finish on the handles can connect the two rooms. Check each choice against the room where it will be used and the product maker's guidance.
Look at samples in both rooms and at different times of day. A finish that feels warm in the kitchen may look different beside the bathroom lighting. Agree where the flooring changes at the doorway and how the junction will be finished. If storage is a priority, decide what must fit inside the cabinets before choosing their appearance.
What to decide before asking for quotes
Give each contractor the same brief and mark the decisions still open. These are the details to include.
- The intended kitchen and bathroom layouts.
- The problems to solve, the fittings to keep or replace, and any work in adjoining rooms.
- Your appliance and shower choices, storage needs and any products you already have in mind.
- What you know about the boiler, drainage and electrics, and what still needs checking.
- Whether you plan to stay, which facilities you must retain and any limits on access.
- Your budget, preferred dates and whether you want a price for one programme, two phases or both.
Ask each contractor to say who will supply and fit the products, take away the old fittings, test the new ones and repair any disturbed floors or walls. Have them identify anything they have allowed for provisionally and anything they have left out.
Questions homeowners ask
Should we do the kitchen and bathroom at the same time?
If you can manage the time without both rooms and the same floor or wall needs opening, one job may suit you. If keeping a room usable or spreading the spending matters more, discuss two phases. Set out what your household needs before choosing the dates.
Can we live at home without a kitchen and bathroom?
Possibly. A fridge freezer and a temporary place to prepare food can help with meals. The deciding question is often whether everyone can use a working toilet day and night. If there is a gap you cannot cover, arrange to stay elsewhere for that part of the job. Check where you can shower too.
Is it cheaper to renovate both rooms together?
Ask for a quotation for both rooms together and one for the same work in two phases. Compare what each includes for lifting floors, protecting the home and putting everything back. Any saving depends on which work would actually have to be done twice.
Do I need a building warrant for a kitchen and bathroom renovation in Edinburgh?
A building warrant gives you permission to carry out certain building work. Replacing a sink with one of the same type can be exempt if the installation is at least as good as before. If you also plan an opening in a wall that supports the floor above, show the plans to your council’s building standards team. Get any warrant you need before work starts. See City of Edinburgh Council’s guidance on replacements and structural changes.
Should I replace the boiler when renovating both rooms?
Keep a note of what happens when the shower and kitchen tap run together. Ask a qualified heating installer to assess the boiler’s condition and whether it can meet the demand from your proposed fittings. That gives you a reason to keep it, alter the system or replace it.
Discuss your project
Sweet Homes supplies and fits kitchens and bathrooms in Edinburgh and the Lothians. If both rooms are part of a larger project, see our home renovation service.
Call Sweet Homes or use our enquiry form. We’ll talk through your plans by phone before arranging any site visit. We take at least four weeks from your first enquiry to scope, prepare and plan your project properly, so it is taken care of rather than rushed.