# How to plan a house renovation: turn your ideas into a clear brief

A practical starting point for a whole-home renovation in Edinburgh and the Lothians.

Renovation guidance

On this page

- [What is a renovation brief?](#what-is-a-renovation-brief)
- [Go room by room, then look at the whole house](#go-room-by-room-then-look-at-the-whole-house)
- [Set a budget range and keep room for uncertainty](#set-a-budget-range-and-keep-room-for-uncertainty)
- [Explain how you will live during the work](#explain-how-you-will-live-during-the-work)
- [Decide what needs attention early](#decide-what-needs-attention-early)
- [Does the work need a building warrant?](#does-the-work-need-a-building-warrant)
- [Check a contractor’s insurance](#check-a-contractors-insurance)
- [Use the same brief to compare quotations](#use-the-same-brief-to-compare-quotations)
- [Questions homeowners often ask](#questions-homeowners-often-ask)

How long could your household live elsewhere while your home is renovated? It is one of the first questions Brunon asks, because the answer shapes the conversation about the scope and timing of a whole-home project. If moving out is not possible, say so early.

Your ideas might include a better kitchen, warmer rooms or a layout that works for family life. Bring them together in a written renovation brief before asking for quotations. It gives the people advising and pricing your project a shared starting point.

You do not need to have every decision settled at the outset. You do need to explain what you want your home to do, which rooms are involved, what matters most and what is still uncertain. This guide helps you prepare that information for a substantial renovation in Edinburgh or the Lothians.

## What is a renovation brief?

A renovation brief is a written account of the result you want and the work you believe may be needed to achieve it. It can be a few pages, supported by photographs, a simple plan and examples of finishes you like. It is a starting document, not a finished design or a contract.

Describe the problem before prescribing the solution. “We need a kitchen where two people can cook while children do homework” gives a designer or builder more to work with than “remove this wall”. You can include the wall as an idea, while asking whether it is practical and what it would involve.

A useful brief records what you know, what you assume and what still needs investigation. Date it and keep a copy of each revision. A verbal explanation can change from one conversation to the next. Different contractors may also suggest different methods. Give each one the same full written scope and supporting information so you can see where their proposals differ.

If it helps, use an AI assistant over a few evenings to organise your household’s ideas into a draft brief. Read it together and check for gaps or contradictions. Treat its suggestions as questions, not verified facts or a finished specification. Then talk through the draft with your contractor and clarify what is practical. Avoid entering personal or sensitive information into a tool unless you are comfortable with how it handles that information.

## Start with the life you want at home

Walk through a typical day. Where do people gather? Where do coats, laundry and cleaning equipment end up? Is there somewhere quiet to work? Consider how the house needs to serve you in the years ahead as well as what frustrates you today.

Write down three or four outcomes in your own words. For example, you might want a connected kitchen and dining space, a quieter place to work, and storage that keeps the hall clear.

Then sort your ideas into three groups:

- **Must have:** the outcomes or work the project needs to deliver.
- **Would like:** valuable improvements that could be adjusted if the budget requires it.
- **Later or undecided:** ideas to explore or leave for a future project.

Make the distinction specific. “More storage” is useful; “space for coats and shoes for four people near the entrance” is easier to discuss.

## Go room by room, then look at the whole house

For each room, note its present use, what is not working and the intended result. A simple table or list is enough. Include adjoining rooms, hallways and access routes where a change in one place affects another.

- **Kitchen and dining:** describe how you cook, eat and use the space. Note appliances, storage needs and any wish to change the layout.
- **Bathrooms:** record who uses each room, whether a bath or shower is essential, and any accessibility needs.
- **Bedrooms and living spaces:** note furniture that must fit, work or study needs, lighting and suitable storage.
- **Hall, utility and circulation:** consider coats, laundry, deliveries and how people move between rooms.
- **Throughout the home:** record heating, flooring, lighting, sockets and finishes you would like reviewed. Identify features to retain.

If you hope to move a toilet, flag it early. In Brunon’s experience, this is often one of the biggest obstacles when changing a layout. Ask the people designing and pricing the work to check what is possible in your particular property before settling on the plan.

For each item, state whether it is essential, desirable or undecided. Add photographs and rough measurements if you have them, clearly marked as approximate.

The room list should add up to one coherent home. For instance, new fitted storage may affect socket positions, while a new kitchen layout may affect lighting. Flag those connections for the people developing the design and quotation.

## Set a budget range and keep room for uncertainty

Renovation can cost more than many people expect. Write down a range you are comfortable discussing, as well as your overall limit. Be clear whether that limit needs to cover design, surveys, applications, temporary accommodation, furnishings and other costs outside the building contract.

Keep a reserve for unforeseen work and decisions that are not yet resolved. The right amount depends on the property and the information available, so discuss it with your advisers rather than treating a standard percentage as a promise. A contractor may identify assumptions or items that cannot be fully assessed until more information is available.

If the likely scope and available budget do not align, return to your priorities. You might reduce the scope, choose a different specification or consider separate phases. Ask what each option changes in the finished result and what information is needed before making the choice. Our guide to [planning a renovation in phases](/phased-renovation-planning-for-busy-households-how-to-improve-your-home-in-stages/) explores that decision in more detail.

## Explain how you will live during the work

Say whether you intend to stay in the property, move out or have not decided. If you could live elsewhere, note for how long and any dates that limit that option. If you plan to stay, identify what your household needs to function: access to a bathroom, somewhere to prepare food, space for home working, or a safe route through the property.

Ask the contractor what can realistically remain available, when services may need to be interrupted and what arrangements need to be agreed. Do not assume every room can remain usable throughout a whole-home project.

Our guide to [living through renovation work](/living-through-renovation-work/) has more questions to help you plan daily life.

## Decide what needs attention early

Before requesting a detailed quotation, establish the intended scope, your priorities, budget range and any household constraints. Identify the rooms affected and the outcomes you expect. Where you have drawings or a specification, share them; where you do not, say what still needs to be developed.

Check whether your property is listed or in a conservation area, and ask the relevant council what that means for your plans. For an Edinburgh property, the [council’s map and guidance](https://www.edinburgh.gov.uk/conservation-2/listed-buildings) are a starting point. For a property elsewhere in the Lothians, check with its own council. Ask early about parking restrictions, deliveries and whether any parking arrangements need to be agreed. Edinburgh Council explains its [parking suspensions](https://www.edinburgh.gov.uk/parking-spaces/dispensations-suspensions).

Bring up proposed structural changes early. A structural change affects the parts that support the building, such as a load-bearing wall. Ask the appropriate designer or structural engineer to assess the proposal and explain what information and permissions are needed. Also flag a possible change to the layout, services or external appearance, even if it is only an idea at this stage.

Agree as many choices as you can within the household early, including tiles, colours and preferred suppliers. Record the level of finish and any products that affect the layout or installation. You do not need to settle every handle immediately, but ask the contractor which selections are needed for a reliable quotation and when the remaining choices must be made. An unspecified item should be clearly identified in the quotation, with any allowance or assumption explained. An allowance is a provisional sum for an item that has not yet been fully specified or priced.

A brief is about what the project must achieve. Once the scope is clearer, our [renovation order of works guide](/how-to-sequence-a-renovation-in-an-edinburgh-home-the-order-that-prevents-rework/) explains how the work can be sequenced.

## Does the work need a building warrant?

In Scotland, some building work needs a building warrant from the local authority before that work starts. A building warrant is permission under the Scottish building standards system. Whether it is required depends on the proposed work and the property; do not assume that every layout change is treated the same way.

If you are considering removing or altering a structural wall, or changing the layout, describe it in the brief and ask your designer or local authority building standards team to check the warrant position. Other permissions, including planning permission or listed building consent where applicable, are separate questions. A warrant does not replace them.

Record the answer and any outstanding checks before agreeing a programme. If a warrant is required, it must be granted before the relevant work starts. The [Scottish Government's building warrant guidance](https://www.gov.scot/publications/making-quality-building-warrant-application-need-know/pages/7/) explains the process.

## Check a contractor’s insurance

Before considering a contractor, ask what insurance they have and to see the policy documents. Check that the cover remains in date for the planned work. Ask what the policies cover, their limits and exclusions, and whether they are appropriate for the work and any design responsibilities. Discuss any uncertainty with the contractor or insurer.

Also ask your own buildings insurer how the renovation and any period away from home affect your cover. [Citizens Advice Scotland](https://www.citizensadvice.org.uk/scotland/consumer/getting-home-improvements-done/before-you-get-work-done-on-your-home-s/) explains the types of insurance to discuss, including public liability and cover for work before completion.

## Use the same brief to compare quotations

Give each contractor the same current brief, drawings and specifications, and tell them about the same unresolved questions. Ask for a written breakdown that makes the scope clear. A comparable quotation should make it possible to see what is included, what is excluded, the products or quality specified, and any assumptions or allowances.

Check whether the price includes VAT, who is responsible for design and applications, and how changes or unexpected findings will be handled. If one quotation leaves out a room, uses a different specification or assumes an existing service can be reused, ask for clarification before comparing totals.

A brief cannot remove every unknown in an existing home. It can make those unknowns visible, so that you can discuss them before agreeing to proceed. Keep the final agreed scope and responsibilities in writing.

## Questions homeowners often ask

### What should I include in a house renovation brief?

Include the outcomes you want, rooms affected, priorities, budget range, household arrangements, timing constraints and the information you already have. Mark uncertain items and questions that need professional advice.

### Do I need finished drawings before asking for a quote?

Not necessarily for an initial conversation. For a detailed quotation, ask what drawings, specifications and other information the contractor needs. The more clearly the proposed work is defined, the easier it is to identify what is included and what remains uncertain.

### How much detail should I give about my budget?

Share a realistic range and explain what must be paid from it. If you have a firm upper limit, say so. Separate the building work from other expected costs so everyone understands the same boundary.

### Can I live in my house during a whole-home renovation?

That depends on the scope and your household's needs. Discuss access, essential rooms and temporary loss of services with your contractor before deciding whether staying is workable. Include the cost of any alternative accommodation in your wider plan.

### Do I need a building warrant to change my layout?

It depends on the work and the property. Ask your designer or the local authority building standards team to check the proposal. If a warrant is required, it must be granted before the relevant work starts.

## Talk through your renovation

If you are planning a substantial project, read about our [home renovation service](/home-renovations-edinburgh/). To start a conversation, call Sweet Homes or use the [enquiry form](/enquire/#project-enquiry). Tell us the property type, the rooms involved, your priorities and where you are in the planning process. A phone call comes before any site visit. Sweet Homes supplies and fits the work it undertakes.

On this page

- [What is a renovation brief?](#what-is-a-renovation-brief)
- [Go room by room, then look at the whole house](#go-room-by-room-then-look-at-the-whole-house)
- [Set a budget range and keep room for uncertainty](#set-a-budget-range-and-keep-room-for-uncertainty)
- [Explain how you will live during the work](#explain-how-you-will-live-during-the-work)
- [Decide what needs attention early](#decide-what-needs-attention-early)
- [Does the work need a building warrant?](#does-the-work-need-a-building-warrant)
- [Check a contractor’s insurance](#check-a-contractors-insurance)
- [Use the same brief to compare quotations](#use-the-same-brief-to-compare-quotations)
- [Questions homeowners often ask](#questions-homeowners-often-ask)

## Planning your project?

[Home renovations](/home-renovations-edinburgh/)\
[Enquire about your project](/enquire/#project-enquiry)

Customer feedback

## What our customers say

4.9/5 from 130+ combined reviews

Google and Edinburgh Trusted Trader

[Read all customer reviews](/reviews-testimonials-from-edinburgh-homeowners/)

## Related services

- [Home renovations](/home-renovations-edinburgh/)
- [Renovation order of works](/how-to-sequence-a-renovation-in-an-edinburgh-home-the-order-that-prevents-rework/)
- [Planning a renovation in phases](/phased-renovation-planning-for-busy-households-how-to-improve-your-home-in-stages/)
- [Living through renovation work](/living-through-renovation-work/)